Position:Home >>

News   

News

1, tooth shaped metal ring shall be for the whole structure. Such as the use of welding structure, should meet the following requirements:
A, it shall seek the consent of the user;
B, should use the full penetration weld structure type, should not exceed 2 welded joints, welding shall be carried out after the stress relief heat treatment;
C, cover layer, welding gear shape and size should be consistent with the other parts remain.
Plane 2, tooth shaped metal ring should be not greater than the outer diameter of the gasket is 1/100.
3, coating materials shall be securely paste shaped metal ring on the teeth, not fall during the transportation and installation process. Using adhesive to metal materials do not produce corrosion. The splice joints should not be more than 2, and the two lap, overlap with oblique stitching; or the use of docking, the seams with a thin covering layer material to be covered.
4, activity on the central and the tooth shaped metal ring on the groove should maintain an appropriate gap, in the thermal expansion, without prejudice to the freedom of movement. Activities on the central can adopt welding.

News

Contact us

Contact Name:ANDY(MANAGER)
E-mail:andy.jsjx@hotmail.com
Skype:andy.jsjx
Tel:0086-573-84120703
Fax:0086-573-84120723
MOBILE:136 6678 2181
Fast navigation
JIASHAN EAST SUNIMP.&EXP.CO.,LTD (EAST MOON INDUSTRIAL LTD) Administration
Contact Name:ANDY(MANAGER) E-mail:andy.jsjx@hotmail.com Skype:andy.jsjx Tel:0086-573-84120703 Fax:0086-573-84120723 MOBILE:136 6678 2181
Office add:NO.510 KaiYuan 2rd Building RenMin Rd.JiaShan,ZheJiang,China Factory add:NO.16 DiZiWei Rd,HengXing Rd, JiaShan,ZheJiang,China